Preparation of Platform

In hidro-electric power plants, the transmission line lies between the regulator and forebay. For the construction of transmission line of water, a platform is to be prepared according to the changing topography. On this platform, the machinery and equipment will be transfered during the construction of the channel and the platform will serve as service way and emergency intervention purposes.
In hyrdo-electic power plant projects, taking the legal permissions for preperation of the platform and also the topographic conditions are relatively time consuming and hard to execute.