Open Channel Construction

After the platform is ready, an open channel must be excavated for the transmission line beginning from the regulator structure proceeding to the forebay.

1120 1121
Once the excavation of the channel is finished necessary bedding and compaction must be done to maintain the lower elevation of the transmission line.

araklihes
Thereafter the construction of the transmission line can begin as whether concrete box or pipeline.

araklihes1