Drainage Piping Works

Once the geomembrane layer is ready, the piping works can be carried out to collect the ore solution with perforated pipes on the heap leach area. Perforated pipes are placed in distances to cover all the heap leach area as shown on the implementation project and connected to each other on main drainage pipes.